New IPO Alert / IPO of CEDB Hydropower Development Company IPO issue date / Baishak 17 IPO

 


There is good news for Share enthusiasts. CEDB Hydropower Development Company  is going to issue IPO to the public from Baishak 17, 2078. The company is going to issue 25,18,230 units shares among which 5 % ( 1,25,911 units shares) is separated for mutual fund whereas 2% (50,365 Units shares) is for the staffs of the company. Last date to fill the IPO is Baishak 21 banking hours. One can apply minimum 10 shares to maximum 25,18,230 units Share. 

CRNL has assigned ‘CARE-NP IPO Grade 4 [IPO Grade Four]’ grading to the proposed Initial Public Offering (IPO) of CEDB Hydropower Development Company Limited (CHDC). ‘CARE-NP IPO Grade 4’ indicates Below Average Fundamentals. 

Sunrise Capital Limited is appointed as the issue manager for IPO.

Applicants who has Meroshare application can apply through Meroshare or it can be applied through the ASBA member's bank and financial institutions. 

 IPO Open Date: 2078-01-17

IPO Close Date (Early): 2078-01-21 (Banking Hours)

IPO Close Date (Lately): 2078-01-31 (Banking Hours)

Recommended quantity to apply: Since DMAT account holders are increasing day by day we recommend to apply not more than 10 share as the distribution will be done by lottery system.

About CEDB Hydropower Development Company

CEDB Hydropower Development Company Limited (CHDC), a public limited company incorporated under the prevalent laws of Nepal on Mangsir 15, 2066 (November 30, 2009). CEDB Hydropower Development Company Limited (CHDC) was founded by the then Clean Energy Development Bank to provide equity investment for hydropower projects to meet energy needs of the nation. CHDC is currently mandated to invest in and develop Hydropower Projects. It has got three hydropower projects in operation and four projects at construction and development stages.

Projects Under Development

1. Tallo Khare Khola Hydropower Project (11 MW)

2. Dordi I Hydro Electric Project (12 MW)

3. Rukum Gad Hydropower Project (5 MW)

4. Kasuwa Hydropower Project (45 MW)


Projects Under Operation

1. Radhi Small Hydropower Project (4.4 MW)

2. Syange Hydropower Project (183 KW)

3. Khudi Hydropower Project (4 MW)

Post a Comment

0 Comments